BRPD Changelog & Document Control
Track all changes to dutyholders, gateways, compliance and documents
7
Total Changes
5
Approved
2
Pending Approval
Changelog Timeline
Fire Safety Strategy approved
Fire safety strategy compliance statement reviewed and approved by Practice Director.
Change Details
under_review→New:approvedChanged by Sarah Mitchell
Approved by Sarah Mitchell
28 Mar 2026
PD competence evidence uploaded
ARB registration certificate and Principal Designer training records uploaded.
Changed by Priya Sharma
25 Mar 2026
Environmental assessment verified
BREEAM pre-assessment submitted and verified. Rating: Very Good.
Change Details
evidenced→New:verifiedChanged by Sarah Mitchell
Approved by Sarah Mitchell
22 Mar 2026
Concept Design Report drafted
Stage 2 concept design report uploaded as draft for internal review.
Changed by Priya Sharma
12 Mar 2026
Structural design info requirement added
New requirement added for Gateway 1: structural design basis documentation.
Changed by Priya Sharma
Approved by Sarah Mitchell
20 Feb 2026
Gateway 1 target date confirmed
BSR pre-application meeting held. Gateway 1 target date set to 01 Jun 2026.
Change Details
TBC→New:2026-06-01Changed by Priya Sharma
Approved by Sarah Mitchell
15 Jan 2026
Principal Designer appointed
Priya Sharma (Studio Mitchell) appointed as Principal Designer for Meridian Tower.
Changed by Sarah Mitchell
Approved by Sarah Mitchell
1 Dec 2025
Document Control Summary
| Title | Status | Last Updated | Evidence Docs |
|---|---|---|---|
| Structural Stability Statement | Under Review | 10 Apr 2026 | 0 |
| Fire Safety Strategy Compliance | Approved | 28 Mar 2026 | 1 |
| Accessibility Compliance | Draft | 1 Mar 2026 | 0 |