Design Risk Workspace
Weybridge School Refurb — Stage 4 Technical Design
1
Open
0
Under Review
1
Significant
openStage 4SIGNIFICANT
Acoustic separation between classrooms below spec
Existing block walls may not achieve BB93 requirements after refurbishment.
Mitigation
Acoustic testing before works. IWL system to be specified if needed.
Owner: James ChenUpdated: 4 Jun 2026